Prime Motion & Control – 100kW Solar Installation

Share This Post

Client: Prime Motion & Control

System Size: 100kW

Approximate Yearly Output: 145,000kWh

Approximate Bill Coverage: 50%

Established in 1984, Prime Motion & Control is Australia’s leading supplier and manufacturer of hydraulic components and equipment for all fluid power applications.

In December 2015 Prime Motion & Control contracted Todae Solar to install a 100kW commercial solar system on top of their building in Malaga, WA. 50% of their electricity bill will now be covered by sustainable energy and 137 tonnes of carbon will be abated every year.

More To Explore

Enquire Now

Fill out the form below and we will get back to you as soon as we can.

Enter Your Details
Enter Your Details